Any post drying processing or remanufacturing will be documented. Any items in inventory prior to the implementation of the Standards that have been processed or remanufactured but information is lacking to meet full certification, must be entered into your inventory management system as a new lumber item with all interim certification required documentation, including the minimum source tree/log information requirements.
2.5.1 Location wood was processed will be documented (REQUIRED) To meet interim certification requirements, this information may not be available and will therefore not be required.
Documentation will include the following information:
2.5.2
The distance traveled from the drying facility to the next location shall be documented. (REQUIRED)
To meet interim certification requirements, this information may not be available and will therefore not be required.
2.5.3
Reprocessing/remanufacturing date will be documented. (REQUIRED)
To meet interim certification requirements, this information may not be available and will therefore not be required.
2.5.4 Individually labeled and stocked items
Quantity, dimensions and cut type of each individual piece cut will be documented and each new item will be tagged. (i.e. cut type may change, or it may simply be surfaced S2S, S4S, etc., resizing boards, and if it was a cant or timber, it can be resawn into boards, edged, or remanufactured into molding, siding, bead board, baseboards, flooring, dowels, etc.) (REQUIRED)
Board footage will be calculated and documented to assign a total board footage to each piece. (REQUIRED)
2.5.5 Bundled Units
Any merging of individual pieces or bundles or the splitting of bundled units into new or separate tracking units or bundles will be documented during the remanufacturing process. (REQUIRED)
Board footage will be calculated and documented to assign a total board footage to each bundle/unit or individual item if from a split bundle. (REQUIRED)
2.5.6 Any traditional wood grades may be documented for either individual pieces or bundled units. (1 pt.)
2.5.7 Reprocessing completed by a USRW Certified Organization. (1 pt.)